Sustainable procurement review

Check your suppliers’ declarations, certificates and test reports against your requirements, and see what’s missing or out of date.

ProjectsSustainable procurement review

  • Niamh Calder
  • Isabel Moreno
  • Tobias Krüger
Ferncastle’s 7 suppliers, checked against its 6 chemical and sustainability requirements.
SupplierEvidence heldStatus
Corran FoamsSVHC declaration, July 2025Renewal due
Marlow TextilesLetter: ‘PFOA-free’1 gap
Brackwood PanelsE1 and FSC certificates1 gap
Lindmoor WeaveDeclaration and test reportComplete
Vardel CoatingsSDS and chamber testComplete
Tessel AdhesivesSDS and training courseComplete
Kestrin SteelSVHC declaration, March 2026Complete

Brackwood Panels Formaldehyde

Status: 1 gap

E1 isn’t enough since 6 August 2026

Limit
0.062 mg/m³ or less
Held
E1 certificate, EN 13986

Your expert signs off each requirement

You get a status for every supplier, a register of the evidence each one holds, and what to ask each one for next.

Approval

Illustrative project

Niamh Calder

Status: Approved

Head of Product Compliance, after checking every supplier against all 6 requirements

  • SVHC

  • Formaldehyde

  • PFAS

  • Flame retardants

  • Diisocyanates

  • Deforestation

Foresight does the research

Your team brings what only it knows, and your expert makes the call at each checkpoint.

Tasks

Illustrative project

3 of 5 tasks done.

  1. Share your suppliers

    Your team

    Status: Done
  2. Draft the requirements

    Foresight

    Status: Done
  3. Agree the requirements

    Checkpoint

    Niamh Calder

    Status: Approved
  4. Review every supplier

    Foresight

    Status: In progress
  5. Approve the review

    Checkpoint

    Niamh Calder

    Status: Not started

Kept current once it’s approved

Monitoring watches the measures behind your requirements. When one moves, Foresight rechecks the suppliers it affects, and your expert reviews the change.

Monitoring

Illustrative project

Watching 4 measures behind the review

  • EU Deforestation Regulation

    Delegated Regulation (EU) 2026/2102 revised the product list on 17 September 2026. Rechecked, panels and wooden office furniture stay in scope.

    Status: To review
  • REACH Annex XVII, entry 77, formaldehyde

  • REACH Candidate List

  • REACH Annex XVII, entry 79, PFHxA

What we need from you

Four things, shared at setup before the project starts.

  1. Your suppliers

    Your suppliers and what each one supplies, from a purchasing list or an approved supplier register.

  2. Your requirements

    The legal limits you must meet, and the sustainability criteria you set yourself, such as no fluorinated finishes on fabrics. If they aren’t written down, Foresight drafts them from the materials you buy and the markets you sell in.

  3. Your evidence

    The declarations, certificates and test reports you already hold, in whatever form your suppliers sent them.

  4. Your approver

    The person who agrees the requirements and approves the review.

What teams ask about this project

How is each supplier assessed?

Against requirements your expert agrees before the review starts. Each one names the evidence that meets it, such as a chamber test result for formaldehyde rather than a panel’s E1 class, so every supplier is held to the same standard.

Where does the evidence come from?

From your suppliers’ own declarations, certificates and test reports, read against the regulations and the regulators’ guidance. Every status links to the requirement’s source, so your team can check the wording directly.

What if a supplier won’t share its formulation?

Foresight asks only for what the requirement needs, such as a declaration against a named list or a test result. If a supplier still won’t confirm, the review records it as a gap, with what was asked and when.

Who checks the review before we use it?

The person you name. They agree the requirements before the review starts, and check the findings against their sources at the end. Nothing is final until they approve it. These checks reduce the risk of error without removing it.

What happens when a rule changes?

Foresight rechecks the suppliers it affects, such as when a substance joins the Candidate List. Any evidence the change makes out of date joins the follow-up queue for your expert to review.

What does it cost?

The price follows the review’s size: how many suppliers and requirements it covers. You see it with the scope, before the review starts.

Bring your supplier list to a demo

Tell us what you hold them to. You’ll see the scope and the price before the review starts.