SCIP notifications
Find out which parts of your products hold a Candidate List substance above 0.1%, and what SCIP needs.

ProjectsSCIP notifications
- Maren Lowther
- Vikram Nair
- Astrid Holm
| Article | SVHC | SCIP status |
|---|---|---|
| Driver enclosure | DBDPE | To notify |
| Cable gland | Lead | Notified |
| Through-wiring | MCCPs | Notified |
| Chip resistors | Lead | Notified |
| Lens gasket | D4, D5 and D6 | Awaiting test |
| Mains cable | DEHP | Not required |
| LED board | TBBPA | Not required |
Driver enclosure
Status: To notifyNotify the driver and 3 luminaires
- Listed
- DBDPE, 5 November 2025
- Measured
- 12% w/w of the enclosure
Your expert signs off each product
You get the SCIP register, the data each notification needs, ready to submit, and the source behind every status.

Approval
Illustrative projectMaren Lowther
Status: ApprovedHead of Product Compliance, after checking every article in all 4 products against its source
Arden high bay
Calder batten
Wren downlight
TD-60 driver
Foresight does the research
Your team brings what only it knows, and your expert makes the call at each checkpoint.

Tasks
Status: In progressIllustrative project3 of 5 tasks done.
Share your products
Your team
Status: DoneDraft the article breakdown
Foresight
Status: DoneAgree the breakdown
CheckpointStatus: ApprovedMaren Lowther
Check every article
Foresight
Status: In progressApprove the register
CheckpointStatus: Not startedMaren Lowther
Kept current once it’s approved
Monitoring watches the measures behind your statuses. When one moves, Foresight rechecks the articles it affects, and your expert reviews the change.

Monitoring
Illustrative projectWatching 4 measures behind the statuses
- Status: To review
Environmental omnibus, COM(2025) 986
On 24 June 2026 the Council agreed its position, which keeps the plan to end SCIP notifications. Rechecked, every notification is still required.
EU POPs Regulation, listing of MCCPs
RoHS exemption 6(c), lead in copper alloy
ECHA restriction intention, aromatic brominated flame retardants
What we need from you
Four things, shared at setup before the project starts.
Your products
Your bill of materials, or your products and the parts in them.
Your supplier data
Declarations and test reports for the parts you buy in, where you have them. Where a supplier hasn’t declared, Foresight lists the question to ask them.
Your SCIP notifications
Any notifications you’ve already made, so each one is updated rather than started again.
Your approver
The person who agrees the article breakdown and approves the register.
What teams ask about this project
Why check each part rather than the whole product?
Because the 0.1% applies to each article in a product, not to the product as a whole. The Court of Justice confirmed this in 2015, in case C-106/14, and the principle is often called “once an article, always an article”. A flame retardant at 12% of a driver’s enclosure stays above 0.1% when the driver goes into a luminaire, so both need notifying.
Where does the evidence come from?
From the measures themselves: ECHA’s Candidate List, REACH, the Waste Framework Directive and the regulators’ own guidance, alongside your suppliers’ declarations and test reports. Every status links to its source, so your team can check the wording directly.
Who checks the register before we use it?
The person you name. They agree the article breakdown before any checking starts, and check each status against its source at the end. Nothing is final until they approve it. These checks reduce the risk of error without removing it.
What happens when a rule changes?
When ECHA adds a substance to the Candidate List, or a restriction or exemption moves, Foresight rechecks the articles it affects. The register your expert approved stays as it is until they accept the change.
Isn’t the SCIP duty being dropped?
Not yet. The Commission proposed ending it in December 2025 and the Council agreed its position on 24 June 2026, but Parliament has still to vote. Until a change is adopted and takes effect, the duty stands. Your duty under REACH Article 33 to tell customers about Candidate List substances above 0.1% isn’t part of the proposal.
What does it cost?
The price follows how many products and parts the register covers. You see it with the scope, before any checking starts.
More ways to meet an obligation
Each runs the same way, with your expert approving the result.
- PPWR compliance programmePackaging requirements, milestones, and evidence in one plan.
- EPR reportingPackaging and product data prepared for each country’s EPR scheme and deadline.
- REACH registration dossiersEU and UK REACH registrations, from data gap analysis to a dossier ready to submit.
- CLP classification and labellingMixture classifications under CLP, and the label elements that follow.
- Poison centre notificationsCLP Annex VIII notifications, with a UFI for each mixture.
- TSCA reportingInventory status, CDR and PFAS reports for substances you make in or import into the US.
- Plant protection product dossierDossier evidence, ownership, and review status in one place.
- Biocidal product dossierProduct authorisation dossiers under the EU Biocidal Products Regulation.
Bring your bill of materials to a demo
Tell us what your suppliers have declared so far. You’ll see the scope and the price before any checking starts.
